Project

01

—

Civic

LAT 51.9244 N · LON 4.4777 E

Halden Public Library

Summary

Rotterdam

·

2024

A white precast library that gives its ground floor back to the city: a covered public room, open 7 to 23, with 1.2 million books above it.

Halden Public Library, white precast fins over a glazed ground floor

Fig. 01 —

Halden Public Library

·

Rotterdam

01 — Project facts

Area

21,400 m²

Completed

2024

Status

Completed

Sector

Civic

Client

Gemeente Rotterdam

Recognition

Lowlands Design Prize 2024

Certification

BREEAM Outstanding

Partners

Lukas de Wit, Hanna Kessler

02 — The project

Brief · Approach · Outcome

The brief

Rotterdam asked for a central library for 2,000 daily visitors on a former car park beside the Coolsingel. The real brief, written with 600 residents over nine months, was shorter: a warm, free, indoor public space that nobody has to justify being in.

The approach

We lifted the collection into a 90-metre white precast box and left the ground floor as a covered plaza: café, children's library, makerspace and a 40-metre reading stair that doubles as an auditorium for 500. Slender fins at 900 mm centres shade the glazing and give the facade its rhythm.

Every floor is a 9 m column grid with 4.5 m clear heights, so the building can become a school, offices or homes without demolition.

Carbon

Precast elements use 50% GGBS cement replacement and were cast 60 km away. Upfront embodied carbon came in at 412 kgCO₂e/m², 31% below our 2025 upfront-carbon target.

The outcome

In its first year Halden welcomed 1.1 million visitors — twice the forecast — and 38% of them came for something other than books. The ground floor now hosts the city's citizenship ceremonies.

The reading stair inside Halden Public Library

Fig. 02 — The reading stair, Halden Public Library

03 — Performance in use

Embodied carbon

412

kgCO₂e/m²

Daily users

2k

per day

Energy use

54

kWh/m²·yr

Public ground floor

68

%

04 — Related work

More Projects

Keep Exploring

04 — Related work

More Projects

Keep Exploring

04 — Related work

More Projects

Keep Exploring

05 — Contact

Planning something similar?

We work with public clients from feasibility to two years after handover. Tell us about the building.

05 — Contact

Planning something similar?

We work with public clients from feasibility to two years after handover. Tell us about the building.

05 — Contact

Planning something similar?

We work with public clients from feasibility to two years after handover. Tell us about the building.

Create a free website with Framer, the website builder loved by startups, designers and agencies.