Project
07
—
Transport
LAT 43.6400 N · LON 79.3750 W
Lakeshore Ferry Terminal
Summary
Toronto
·
2026
A thin white canopy over a glazed hall and timber deck: the new gateway to the Toronto Islands, opening summer 2026.

Fig. 01 —
Lakeshore Ferry Terminal
·
Toronto
01 — Project facts
Area
9,400 m²
Completed
2026
Status
On site
Sector
Transport
Client
City of Toronto Waterfront Office
Recognition
Canadian Architect Award of Excellence 2023 (unbuilt)
Certification
Targeting LEED Platinum
Partners
Ama Mensah, Tomás Ward
02 — The project
Brief · Approach · Outcome
The brief
Replace the 1970s island ferry terminal, which handles 1.4 million passengers a year through a building designed for a third of that, and give the waterfront a public park on its roof.
The approach
One 140-metre steel canopy covers queueing, ticketing and a waterside café; it is thin enough at its edge to read as a line against the skyline. A timber deck steps down to the water so the terminal is a place to sit, not only to wait.
Status
The structure topped out in March 2026. The terminal opens to passengers in July 2026, with the rooftop park following in spring 2027.

Fig. 02 — The waiting hall and lake view, Lakeshore
03 — Performance in use
Embodied carbon
340
kgCO₂e/m²
Daily users
8k
per day
Energy use
52
kWh/m²·yr
Public ground floor
85
%


